Coolant flow (AD/B)
For Internal Coolant Supply (IK) through the spindle we offer different solutions:
Form A without IK ( = external coolant supply)
pull studs with or without bore can be used.
Form AD IK central through spindle
Use pullstuds with bore
Form B IK through bores over collar
Use pullstuds without bore
Form AD/B combined version
IK either central or over the collar possible
Use pullstud as mentioned above
The coolant bores for Form B are sealed with plastic dowel and screw, which can be removed if needed.
Do not re-use dowel and screw after taking them out of bore.
Form A without IK ( = external coolant supply)
pull studs with or without bore can be used.
Form AD IK central through spindle
Use pullstuds with bore
Form B IK through bores over collar
Use pullstuds without bore
Form AD/B combined version
IK either central or over the collar possible
Use pullstud as mentioned above
The coolant bores for Form B are sealed with plastic dowel and screw, which can be removed if needed.
Do not re-use dowel and screw after taking them out of bore.